Skip to content

Track Geotechnology And Substructure Management Work

You cannot manage what you do not measure. Traditional methods (track geometry cars and visual inspection) are insufficient for substructure. Modern relies on non-destructive testing (NDT) and geophysical methods.

If track geometry cars show a "sinusoidal dip" pattern every 20–40 feet, or if GPR shows a subgrade moisture lens covering 90% of the corridor, localized repairs are futile. At this stage, the track must be removed, the subgrade excavated to a competent layer, and a new formation built with engineered fill and geocomposite drainage layers. Track Geotechnology and Substructure Management